<?xml version="1.0" encoding="UTF-8"?>
<xml><records><record><source-app name="Bibcite" version="8.x">Drupal-Bibcite</source-app><ref-type>27</ref-type><contributors><authors><author><style face="normal" font="default" size="100%">Cynthia Liem</style></author><author><style face="normal" font="default" size="100%">David Baker</style></author><author><style face="normal" font="default" size="100%">Ioannis Samiotis</style></author><author><style face="normal" font="default" size="100%">David Weigl</style></author><author><style face="normal" font="default" size="100%">Nicolás Gutiérrez</style></author><author><style face="normal" font="default" size="100%">Juan Gómez</style></author><author><style face="normal" font="default" size="100%">Maria Pascual</style></author><author><style face="normal" font="default" size="100%">Emilia Gómez</style></author></authors></contributors><titles><title><style face="normal" font="default" size="100%">Deliverable 6.8 - Mid-term evaluation</style></title></titles><keywords/><dates><year><style face="normal" font="default" size="100%">2020</style></year></dates><urls><style face="normal" font="default" size="100%">https://trompamusic.eu/deliverables/TR-D6.8-Mid_Term_Evaluation.pdf</style></urls><abstract><style face="normal" font="default" size="100%">This deliverable contains the mid-term evaluation report for the prototypes developed in the context of TROMPA’s five use cases. The deliverable is a continuation of the work reported in all earlier deliverables of WP6, which moved from mock-ups testing (D6.1), through a global planning (D6.2) for five use case specific prototypes, of which the technical status has been documented in D6.3-6.7. Currently, we present the user-facing evaluation results involving these prototypes. Due to the COVID-19 crisis, conducting user studies has turned out more challenging than initially foreseen: user studies and prototype showcases could not be performed in in-person setups, and overall, scheduling under remote conditions has become more uncertain. This required adaptations in the participant recruitment and study setup strategies, as already discussed in D6.3-6.7. As a consequence, with approval of our PO, this deliverable is published 2 months later than originally foreseen. For each of the use cases, we report on the current status, user-facing evaluation outcomes, and future prospects in a standardised reporting structure.&#13;
</style></abstract></record></records></xml>
